
OneInterface Engineering, LLC is a carefully assembled
team of focused building technology system experts
providing comprehensive building systems technology engineering,
technology-centric electrical engineering, and completely integrated
enterprise network engineering services. Our philosophy that a
single ubiquitous transport, the data network, should ultimately
unify all technologies is evident in our company name.
OneInterface for all enterprise technologies.

Working with an Architect, or directly for the Owner, we provide leading edge
technology and electrical construction documents for turnkey realization of the
Owner's technology vision. We have the proven expertise, experience, and
production capacity to fulfill your largest and most sophisticated project
requirements.

Through passionate technical leadership, technology systems specialization by
designer, and unrivaled design document detailing, we provide the most
technically comprehensive and thoughtful end-to-end technology design
solutions available. Owner ratified design intent is made a reality through
enforceable, rigorously detailed construction documents.


-
Power & Lighting Design -
Technology Systems -
A/V & Sound Systems -
Network Design -
Building Automation -
Fire & Life Safety

New FCC Parking Structure
The five-level structure, one of only a few in the City of Fresno, has 864 total parking stalls with an additional 125 stalls in adjacent lots. The $18.3 million project is funded through Measure C passed by the voters in 2016. The contractor is Bomel Construction Inc.
Nov 30, 2022
SJDC New Data Center
SJDC has completed construction and the building users have moved into their new office spaces. This state-of-the-art facility consists of 1.2 Megawatts of E-power, a passive precision cooling method, and a fully TIA-942 compliant infrastructure design. The Data Center houses the administrators, programmers and help desk staff.
Tue, Feb 23, 2022
Clovis West HS Tech/FA/PA Mod
This $4M project took less than a year to complete and consists of complete data cabling upgrades and includes a complete FA and PA systems replacement as well. This challenging project timeline required multiple systems to operate in parallel until completion. All new systems are now functional and the demolition phase is in progress.
Tue, Feb 23, 2022
City of Clovis / Clovis USD MAN
The project contract has been extended to allocate additional fiber to the Fresno City limits for the next phase of the project. The project consisted of nearly 50,000 ft of conduit infrastructure and 300,000 ft of fiber optics. Clovis USD will have fiber optic connectivity to 90% of their schools within the City of Clovis boundaries.
Tue, Feb 23, 2022
Old Admin Building at FCC
Construction has completed for the first three phases of this five phase project. The OABt is now a high-tech learning environment with preservation of its original heritage. Open house ceremonies were held in January and the District has releasing the Bid Documents for the State Chancellors review to complete the last phases.
Tue, Feb 23, 2022

Rackspace Taken Down By Ransomware
Rackspace’s hosted Microsoft Exchange services taken down
Dec 03, 2022
Scientists Break Nature Parity Laws
The ramifications of this discovery have not been determined
Sat, Mar 20, 2022
Machine Learning - Information
Supervised and Unsupervised Machine Learning Overview
Tue, Feb 23, 2022
An interesting take on the fall of Sun
How Sun's need to control the code cost them the company.
Tue, Feb 23, 2022